Switch out your diesel generator lighting plants for solar battery technology.
Zero fuel costs, zero emissions, zero daily labour with automated sensor lighting.
No need for someone to turn them on or off, no service truck required to attend.
Email us for a 2 week trial today.
Our current fleet has been hired out since April 2021.
Client savings calculator
Fuel savings
$18,344 month
Emissions saved
27,099 kg CO2 month
Labour savings
$31,616 month
Lighting up the Pilbara and Goldfields regions all year round.
Lights: 6 x LED modules
Coverage: 120m x 120m
Solar efficiency output: 1 hr sun / 3.5 hrs light
Battery: 14.4kWh
Working temperature: 0-55 degrees Celsius
Certified wind load: 100 km/h
Each lighting plant is road registered
Manufactured with forklift and tie down points
Fitted out to mine specifications
Free delivery to your chosen location in Perth Metro
For our mining clients, we provide non compete branding and logos, using our parent company OP COLLECTIVE PTY LTD
Ask about our 2 week free trial today.
© Copyright JUDDRILL